back

Business segments

Projects as (joint) general contractor

elbatronic GmbH

Freital

elbatronic GmbH

Construction year:

2016

New company headquarters as a combined office and production building

The circuit-board specialist was founded in 2012 and has since grown dynamically with innovative developments. The new company headquarters was to communicate this profile in a modern and original form language – functionality, a sense of realism and budget discipline were at the same time unconditional parameters. The result: Exactly seven months after the first spade of earth was turned, a relaxed client and his team of 13 employees were able to move in and commence trouble-free production.

Services:

Turnkey completion, including technical building services

additional information:

www.elbatronic.de

Projects as (joint) general contractor

Gentherm Macedonia DOOEL

Alinci Prilep

Gentherm Macedonia DOOEL

Construction year:

2016

New production facility in Macedonia

The US automobile industry supplier chose Macedonia as a new production location and has invested over €20 million. The facility comprises a production hall, an office building, a technical services centre, warehousing and a gatehouse – with a total useful area of 6,000 m². Special challenges: Further planning parallel to implementation, earthquake protection, high time pressure, and partial commissioning already during construction. The official inauguration was held just seven months after the start of construction work.

Services:

Implementation planning, steelwork and outer shell

additional information:

www.gentherm.com

Projects as (joint) general contractor

ECL euro.COURIER Logistics GmbH

Chemnitz

ECL euro.COURIER Logistics GmbH

Construction year:

2014

New company headquarters as administrative and logistics centre

The high-tech logistics specialist, originally founded as a local courier service in Chemnitz in 1993, was looking for a building concept which would not only meet all operational requirements, but also convey the visionary self-perception of the company. This vision was served with an exclusive, futuristically timeless “spaceship” as a hub for cross-docking and high-availability logistics. The €2.5 million investment, covering a total area of 8,500 m², conveys a clear message to customers: ECL is active day and night and with a modern fleet on their behalf.

Services:

Turnkey completion, without technical building services

additional information:

www.ecl24.de

Projects as (joint) general contractor

Autohaus Jörg Pattusch GmbH & Co. KG

Dresden

Autohaus Jörg Pattusch GmbH & Co. KG

Construction year:

2013

Audi Terminal Dresden

Audi dealerships all over the world must adhere to common corporate architecture specifications – the so-called “Audi Terminal” concept: A metal facade comprising folded aluminium sheet with honeycomb perforations, an interior dominated by characteristic “Audi curves” and distinctive oblique glazing at the points of intersection with the facade. Within this framework, the dealership is free to plan and realise the building with appropriate individual details. There are many such terminals worldwide – but never before could a terminal project be handed over without construction defects …

Services:

Structural analysis, implementation planning, steelwork and outer shell

additional information:

www.pattusch.de

Projects as (joint) general contractor

steelconcept GmbH

Chemnitz

steelconcept GmbH

Construction year:

2011

New company headquarters with showroom function

After 10 years in which the company had grown and flourished, it was time to move into a new production and office building of our own. The demands to be met: A distinctive but nevertheless authentic appearance, creation of an attractive working and production environment, demonstration of our capabilities to clients, and implementation of modern energy concepts. The outcome is a literally “prizewinning” ensemble which expresses the steelconcept values “versatile, reliable, efficient and aesthetic” in an intuitive manner.

Services:

Turnkey completion, including technical building services

additional information:

www.steelconcept.de

Infrastructure

Regional authority for roadworks and traffic

Wittgensdorf

Regional authority for roadworks and traffic

Construction year:

2016-2017

Steel construction of a suspension bridge for the Chemnitztal cycle path near Wittgensdorf

The cable suspension bridge carrying the Chemnitztal cycle path between Köthensdorf and Auerswalde is 2.50 metres wide and 105 metres long, with a centre span of 62 metres over the Chemnitz river. The two pylons are each approx. 14 metres high. The design also required the incorporation of dynamic vibration absorbers, while the balustrade infill is realised as stainless steel netting. With regard to execution quality, the construction is subject to the particularly strict demands of the ZTV-ING guidelines.

Services:

Implementation planning, steelwork and erection as a member of a consortium

additional information:

www.lasuv.sachsen.de

Infrastructure

County seat Limbach-Oberfrohna

Limbach-Oberfrohna

County seat Limbach-Oberfrohna

Construction year:

2016

Steel construction of a pedestrian bridge over the Zwickauer Mulde river near Wolkenburg

The replacement for a lower predecessor bridge destroyed during the extreme floods of June 2013 now crosses the river at a height of five metres. It is designed as a steel, cable-stayed bridge with a single 13-metre pylon. The overall span reaches 84 metres, with additional foreland sections on both banks. The result is an elegant construction whose grey-blue colour enables it to blend harmoniously into the romantic Mulde valley below Wolkenburg Castle.

Services:

Implementation planning, steelwork and erection as a member of a consortium

additional information:

www.limbach-oberfrohna.de

Infrastructure

Baby Smile Fotografie GmbH & Co. KG

Chemnitz

Baby Smile Fotografie GmbH & Co. KG

Construction year:

2015

World's first interactive honeycomb bridge

In conjunction with the revitalisation of the listed industrial complex “Alte Haase-Färberei”, an innovative pedestrian bridge was erected over the Chemnitz river. Partners in this research network project, alongside steelconcept, were the Department of Lightweight Structures and Polymer Technology of the Chemnitz University of Technology, the Saxon Textile Research Institute, and the companies Hentschke Bau and Fiber-Tech Products. The steel-GFRP construction has a span of 32 metres.

Services:

Implementation planning, steelwork and erection as a member of a consortium

additional information:

www.babysmile24.de

Infrastructure

Keck Energieservice GmbH & Co. KG

Keck Energieservice GmbH & Co. KG

Construction year:

2015

Card-operated fuel station with CI relaunch

Energy service provider Keck operates a nationwide network of approx. 60 card-operated fuel stations suitable for lorries and commercial vehicles. A further fuel station in the immediate vicinity of the new company headquarters built for ECL euro.COURIER Logistics GmbH [Link] also served as a pilot project for a comprehensive design relaunch. The bright red polycarbonate panelling of the fuel pump canopies now ensures that the operator’s CI colour is readily visible also from afar.

Services:

Implementation planning, steelwork and erection, including roofing and walls.

additional information:

www.keck-energie.de

Machine and plant engineering

Taiyo Europe GmbH

Rottweil

Taiyo Europe GmbH

Construction year:

2016

Mobile work platform for installation of the membrane facade on the Rottweil Test Tower

A ring-shaped mobile platform (outer diameter: 42 m) was required to enable installation of the membrane facade on the 246-metre test tower of thyssenkrupp Elevator AG. It was at the same time to serve as a transport elevator. The weight of the platform itself also had to be kept to an absolute minimum to achieve the required load capacity of 25 tonnes. The construction comprises over 10,000 individual parts, including nodes bringing together up to 12 members. In the end, it was possible to limit the weight of the platform to less than 40 tonnes.

Services:

Implementation planning, steelwork and erection

additional information:

www.taiyo-europe.com

Machine and plant engineering

HIGHVOLT Prüftechnik Dresden GmbH

Dresden

HIGHVOLT Prüftechnik Dresden GmbH

Construction year:

continuous

Shielded cabins for high voltage testing systems

The world market leader for high voltage testing and measuring systems must ensure that its installations are hermetically protected against all external disturbances. To this end, integrated cabins serve as Faraday cages. The cabins comprise separate testing and control rooms, and can also be provided with optional air-conditioning systems and overhead cranes. All installed components must be appropriately certified. The hall design can be varied in accordance with customer-specific wishes, and systems are installed all over the world.

Services:

Implementation planning, manufacture and assembly

additional information:

www.highvolt.de

Machine and plant engineering

Maschinenbau – Service – Automatisierungstechnik Chemnitz GmbH

Maschinenbau – Service – Automatisierungstechnik Chemnitz GmbH

Construction year:

continuous

Frames and enclosures for special engineering

MSA is an acknowledged specialist in the fields of forming, hardening, industrial handling and assembly technologies. Corporate philosophy places a clear focus on the company’s core competencies, such as electrical, pneumatic and hydraulic planning, as well as system programming. Both the heavy frame parts and precision components for the systems are obtained from suppliers. Customised manufacturing is performed on a project-specific basis, and includes also relevant design modifications.

Services:

Manufacture and pre-assembly

additional information:

www.msa-chemnitz.de

Machine and plant engineering

KraussMaffei Technologies GmbH

KraussMaffei Technologies GmbH

Construction year:

continuous

Machine and control platforms

The world market leader in the field of injection moulding, extrusion and reaction technologies configures customised production lines for the plastics and rubber processing industries. The necessary peripherals here include platforms and pedestals in project-specific designs and with individual load-bearing capacities, the features of which are expected to reflect the high standards of the installations in terms of value, efficiency and need-based functionality. The complete systems are exported worldwide.

Services:

Structural analysis, design, manufacture and assembly

additional information:

www.kraussmaffei.com

Special constructions

Gebäudesicherung Eckert GmbH

Chemnitz

Gebäudesicherung Eckert GmbH

Construction year:

continuous

Steel beams and supports for the stabilisation or translocation of facades, gables and other building parts worthy of preservation

Historical buildings are essentially irreplaceable, but should at the same time allow use in accordance with present-day needs. Conversion often requires extensive removal of the internal structures. The reliable securing of a listed facade ensures investors the greatest possible freedom to build. Special steel constructions provide temporary or even permanent support – and complete parts of a building can even be shifted to a new location with the aid of a “transport cage”.

Services:

Implementation planning, steelwork and erection

additional information:

www.eckert-chemnitz.de

Special constructions

Pockauer Werkzeugbau Oertel GmbH

Pockau-Lengefeld

Pockauer Werkzeugbau Oertel GmbH

Construction year:

repeated

Heavy-duty storage racks

The client is a specialist toolmaker for stamping and forming processes. To shorten the running-in process on the customer’s premises, new tools are already tested and optimised on machines in the factory. Individually designed heavy-duty racks with extendable shelves running on ball bearings are ideal for intermediate storage. A load-bearing capacity of up to 4 tonnes per shelf is possible. The heavy tools are thus kept readily accessible and are easy to remove by crane or forklift truck.

Services:

Implementation planning, steelwork and erection

additional information:

www.pw-oertel.de

Special constructions

SEIWO Technik GmbH

SEIWO Technik GmbH

Construction year:

repeated

Steel constructions for museums and exhibitions

The client is a branch leader with many decades of experience as a supplier of custom solutions in the field of museum and exhibition design. High-quality fittings and special constructions are designed, manufactured and installed in accordance with the architect’s drawings. In the case of larger steel elements such as platforms, ramps and advertising structures, manufacture is entrusted to external suppliers with a reputation for work to corresponding quality standards.

Services:

Structural analysis, implementation planning, steelwork and erection

additional information:

www.seiwo.de

Special constructions

Central Bank of Nigeria

Lagos

Central Bank of Nigeria

Construction year:

2012

Steel substructure for the safety net of a helicopter platform

A helipad was installed on the roof of the 100-metre-high bank building in the city centre of Lagos Island, with an approx. 3-metre-wide safety net extending around the landing platform. The necessary substructure for this safety net was manufactured.

Services:

Steelwork and erection

additional information:

www.cbn.gov.ng

Design structures

thyssenkrupp Elevator AG

Rottweil

thyssenkrupp Elevator AG

Construction year:

2015-2017

Steel substructure for the membrane facade of the Rottweil Test Tower

The 246-metre-high tower, in which new express elevator systems are to be tested, has been designed with a special textile facade – never before has an architectural membrane been installed at such height. The membrane acquires its distinctive spiral appearance from a substructure with six parallel lengths of curved steel tubing. Crease-free installation of the non-elastic fabric (17,000 m²) demands millimetre precision over the whole height of the steel substructure.

Services:

Implementation planning and steelwork

additional information:

https://testturm.thyssenkrupp-elevator.com/

You can follow the course of construction hier.

Design structures

Israel Antiquities Authority

Jerusalem

Israel Antiquities Authority

Construction year:

2015

Steel construction for the membrane canopy over the Schottenstein National Campus for the Archaeology of Israel

The membrane (50 x 40 m) which spans the inner courtyard of the campus complex in the form of a funnel is held at the corners by four V-shaped steel supports, each of which is 9 metres long. As the dimensions of the membrane fluctuate with the temperature, the corner supports could not be designed with fixed anchors. Instead, they rest on floating spheroidal bearings, with tensioning cables providing for lateral stability. The construction comprises a total of 988 individual components.

additional information:

www.antiquities.org.il

Design structures

Heritage Malta

Kalkara

Heritage Malta

Construction year:

2015

Steel construction for the protective shelter over the Tarxien temples

The Tarxien temple complex in Malta comprises four sacral buildings from the period between 3250 and 2500 BC. The UNESCO world heritage site is protected with a 3,000 m² membrane shelter. Two curved truss girders, 72 and 78 metres long, provide the substructure for the PTFE-coated glass-fibre fabric which arches over the excavation site in a single span. Contractor Taiyo Europe GmbH received an IFAI award for the project in 2016.

Services:

Implementation planning, steelwork and erection

additional information:

www.heritagemalta.org

Design structures

The Coca-Cola Company

London

The Coca-Cola Company

Construction year:

2012

Steel construction for the membrane facade of the Coca-Cola Beatbox installed in the forefront of the Olympic Games in London

The Coca-Cola Pavilion in the Olympic Park was conceived as a combination of architecture and musical instrument. Its facade comprised 230 ETFE membrane cushions, each 5 m² in size, which were interlocked for stability and in part served as interactive sound elements which could be “played” by visitors. The task was to design retaining and jointing elements for the aluminium-framed cushions. The extremely complex spatial geometry of the individual surfaces dictated a challenging trial assembly.

Services:

Implementation planning, steelwork and erection

additional information:

www.coca-colacompany.com

Design structures

TLG Immobilien AG

Berlin

TLG Immobilien AG

Construction year:

2005

Fluchttreppe im Altchemnitzer Wirkbau-Ensemble

Der Wirkbau ist ein zentral gelegener historischer Industriekomplex, 1883 durch den Textilmaschinenbauer Schubert & Salzer begründet. Das denkmalgeschützte Areal beherbergt nach umfänglicher  Sanierung zahlreiche Firmen u. a. der Kreativwirtschaft. Als Außenfluchtweg für ein restauriertes Bürogebäude kommt ein 43 m hoher futuristischer Treppenturm in dreidimensionaler Rahmenbauweise zur Ausführung, der einen harmonischen Kontrast zum Umfeld bildet.

Services:

Statik, Stahlbau und Montage

additional information:

www.tlg.de

Commercial and industrial hall construction

FeinwerkTechnik GmbH

Geising

FeinwerkTechnik GmbH

Construction year:

2011 and 2016

Design-oriented extensions for production and storage

The pre-war production building, which had already been extended once in 1997, stands directly on the main road through the small town of Geising. When business development necessitated further expansion, it seemed only logical to combine this prominent location with a modern design: The innovative core of the company is now also demonstrated outwardly, and the previously rather inconspicuous complex serves as an invitation to take interest in what is going on inside.

Services:

Idea and architecture, implementation planning, carcass, steelwork, finishing trades

additional information:

www.fwt-geising.de

Commercial and industrial hall construction

Tenowo GmbH

Mittweida

Tenowo GmbH

Construction year:

2015

Column-free production hall with a 43-metre span

For the construction of a new production hall for non-woven fabrics, a width of 43 metres was to be spanned without intermediate columns. A classic trussed design would have required a girder height of approx. 2.20 metres and would have been very costly. The more economical alternative chosen was to use corrugated web beams, whose lighter weight and reduced height of just 1.10 metres translate into a significant cost advantage. The tapered ends, furthermore, permit optimum utilisation of the roof height over the whole width of the hall.

Services:

Structural planning and realisation

additional information:

www.tenowo.com

Commercial and industrial hall construction

Förster welding systems GmbH

Hohenstein-Ernstthal

Förster welding systems GmbH

Construction year:

2014

Production hall alongside a lower existing building

A new hall with a roof-mounted crane was to be erected as a direct extension of an existing production building. Due to the height difference, however, there was a risk of excessive snow accumulation in the dip of the roof, which would have required cost-intensive strengthening of the original building structure. Solution: The new hall roof extends approx. 5 metres over the old roof, and thereby eliminates the snow trap. A further challenge: The buildings stand right up to the site perimeter, which meant that all construction work had to be performed from the inside.

Services:

Structural analysis, implementation planning, carcass, steel structure, outer shell

additional information:

www.forster-welding-systems.de

Commercial and industrial hall construction

IWR Industrieservice Erzgebirge GmbH

Grünhain-Beierfeld

IWR Industrieservice Erzgebirge GmbH

Construction year:

2014

Production hall meeting enhanced stability demands

At an altitude of 625 metres in the Erzgebirge Mountains, the site of the new building is assigned to the highest German snow load zone 3. At the same time, a 32-tonne overhead crane system was required for the CNC machining of heavy precision workpieces. Taking into account the enhanced structural demands which result from the combination of these two load aspects, a supporting structure comprising vertical and horizontal trusses achieved a cost-optimised solution for the 25-metre span of the new hall (length 60 m, height 11.5 m).

Services:

Supporting structure and complete outer shell

additional information:

www.iwr-gruenhain.de

Commercial and industrial hall construction

Siemens AG Niederlassung Dresden

Dresden

Siemens AG Niederlassung Dresden

Construction year:

2014

Roofed bridge crane

A roofed annex with a 210-tonne bridge crane was to be erected to provide a protected outdoor loading/unloading zone. The annex is 22.5 metres wide, 50 metres long and 20 metres high. The supporting structure designed for this purpose comprised sixteen 1.50‑metre-wide trussed pillars. The steelwork was delivered to the site by special oversize road transport using an extendable semi-trailer.

Services:

Structural planning, manufacture and erection, including roof

additional information:

www.siemens.de

Commercial and industrial hall construction

Atramex Produktions GmbH

Limbach-Oberfrohna

Atramex Produktions GmbH

Construction year:

2014

Column-free production hall with a 35-metre span

A production hall with floor space of approx. 2,500 m² was to be erected alongside an existing office building. The column-free span measured 35 metres and the location belonged to snow load zone 2. The solution was to design a supporting structure with 1.60‑metre corrugated web beams. A comparable trussed structure would have required a beam height of approx. 2.90 metres, adding not only to the weight, but also to the costs, e.g. for transportation.

Services:

Implementation planning, carcass, steel structure and outer shell

additional information:

www.atramex-vertrieb.de

Commercial and industrial hall construction

Frauenthal Automotive Elterlein GmbH

Elterlein

Frauenthal Automotive Elterlein GmbH

Construction year:

2014

Renovation and expansion of a production complex without interrupting operation

An old brick building was to be demolished and replaced without interrupting production in the other buildings on the densely built site. Solution: A complete roof was erected over the existing building and an adjacent yard, covering a total area of 2,200 m². Given the problematical access, corrugated web beams were the obvious choice to span the required width of 36 metres without supports. After demolition of the old building, the roof structure was completed to produce an enclosed hall.

Services:

Implementation planning, supporting structure and outer shell, including noise barrier as a lightweight construction

additional information:

www.frauenthal-automotive.com

Infrastructure

Statkraft Markets GmbH

Hannoversch Münden

Statkraft Markets GmbH

Construction year:

2012

Weir bridges at the Werrawerk hydropower plant near Hannoversch Münden

The run-of-the-river hydropower plant “Letzter Heller”, parts of which are listed as industrial monuments, was built in the 1920s. Within the framework of a comprehensive renovation project, the 31-metre-long steel bridges over the two weirs were also replaced. The trussed girder constructions, which were divided into three sections for transport, were based on the proportions of the original footbridges, so as not to alter the overall appearance of the complex.

Services:

Steelwork and erection

additional information:

www.statkraft.de

Projects as (joint) general contractor

Erection of the IMK engineering head office

Chemnitz

Erection of the IMK engineering head office

Construction year:

2017

Erection of the head office to be used as office and manufacturing base

 

IMK engineering has been developing machines, special-purpose vehicles and gadgets since 1990. Within complex projects for clients of different industrial sectors working all over Europe, Asia and Africa they combine all steps from the idea to the fabrication of prototypes and pilot lots. By buying the FRAMO logo they´ve been consciously refering to the tradition and expertise of Saxon automotive industry since 2002.

Since June 2017 we´re working on the realisation of that project on Jagdschänkenstraße. The modern architecture is an attractive combination of transparency and discretion, both being two distinctive features of the company itself.

visualisation: © furoris X art

photo: furoris X art / Christian Reuther

Services:

Turnkey erection without technical building equipment

additional information:

Commercial and industrial hall construction

Expansion of plant 3 at RATIONAL AG

Landsberg/Lech

Expansion of plant 3 at RATIONAL AG

Construction year:

2008, 2013, 2014 and 2017

Expansion of the production complex in several sections - this time by 16.000 sqm

RATIONAL AG is world market leader in thermic food production for canteen and business kitchens. All machines are being produced in Landsberg/Lech. Because of the consistent company growth plant 3 has been expanding in several sections since 2008. The current expansion covers 16.000 sqm where we´re goingt to mount a steel construction weighing about 1.500 t. Because of a strict time schedule we´ve only got 6 weeks for the main installation.

Services:

Fabrication and installation of the supporting structure including stairs, stages and racks, partly planning the plant.

additional information:

www.rational-online.com

Design structures

Temme // Obermeier GmbH

Pfullendorf

Temme // Obermeier GmbH

Construction year:

2018

steel construction to the pendulum system of Staufer-Barracks Pfullendorf

For the parachutist training of the German Armed Forces there´s a new pendulum system being built at Staufer-Barracks Pfullendorf. It´s needed to exercise posture before and creeping when landing. To successfully pass the pendulum test is the supposition to take part in leaps service.

The hemispherical dome (13m high, 25m cross-section dimension) is made of a filigree load carrying construction with a membrane cover. The dome is being assembled of 540 steel pipes on location.

Services:

implementation planning and steel construction

additional information:

https://www.to-experts.com/

Commercial and industrial hall construction

Wrought & Metalworking Weise Hartmannsdorf

Hartmannsdorf

Wrought & Metalworking Weise Hartmannsdorf

Construction year:

2017-2018

Small assembly and storage hall within an in town consisted object

It´s been a farrier first but has been changed into a modern company of master craftsmen for works of artist blacksmith and steel construction since 1977 thoughout two generations. The next step was to build an assembly and storage hall of 200sqm including crane runway, sectional door and awning. Adjacent but out of square to the tight working panel there are two consisted objects. Because of that a high level of detail care and skilled craftsmanship are needed in order to connect old and new. Construction site logistics and assembly assume a prudent process planning because of the very limited space and driveway as well as the neighboring residential area. After completing on schedule and budget suitable the new functional construction perfectly fits into the consisted object.

Services:

statics, implementation planning, fabrication and assembly of steel construction inclduing overwrap (roof, wall, door and window)

additional information:

www.schlosserei-weise.de

Machine and plant engineering

Skids for modular frame-mounted industrial facilities

Skids for modular frame-mounted industrial facilities

Construction year:

repetetive

ASTRA Industrieanlagen is a systems supplier for pipeline construction and plant engineering located in Zwickau. Their range of services contains complete moduls made of skids that are mainly used by the chemical industry worldwide, in energy industry and gas processing. Those individual frame constructions with several installation elements enclose space volumes of 120m³ and even more. Because of the size sometimes  special loads  are necessary even with police accompaniment and that requires an exact observance of schedule.

 

pics: Scholpp

Services:

production

additional information:

http://www.astra-industrie.eu/de/